Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Nakahira, Masataka
JAERI-Research 2005-030, 182 Pages, 2005/09
It is difficult for Vacuum Vessel (VV) of ITER to apply a non-destructive in-service inspection (ISI) and then new safety concept is needed. Present fabrication standards are not applicable to the VV, because the access is limited to the backside of closure weld of double wall. Fabrication tolerance of VV is 5mm even the structure is huge as high as 10m. This accuracy requires a rational method on the estimation of welding deformation. In this report, an inherent safety feature of the tokamak is proved closing up a special characteristic of termination of fusion reaction due to tiny water leak. A rational concept not to require ISI without sacrificing safety is shown based on this result. A partial penetration T-welded joint is proposed to establish a rational fabrication method of double wall. Strength and susceptibility to crevice corrosion is evaluated for this joint and feasibility is confirmed. A rational method of estimation of welding deformation for large and complex structure is proposed and the efficiency is shown by comparing analysis experimental results of full-scale test.
Suzuki, Hiroshi; Holden, T. M.*; Moriai, Atsushi; Minakawa, Nobuaki*; Morii, Yukio
Zairyo, 54(7), p.685 - 691, 2005/07
no abstracts in English
Nakahira, Masataka; Takahashi, Hiroyuki*; Inoue, O.*; Koizumi, Koichi; Shibanuma, Kiyoshi; Tada, Eisuke; Onozuka, Masanori*; Ioki, Kimihiro*
Proceedings of the 18th IEEE/NPSS Symposium on Fusion Engineering (SOFE '99), p.245 - 248, 1999/00
no abstracts in English